Freeport, Maine

Repair of a Failing Cribwork Seawall. 

Project Details

The existing structure was falling apart due to age and rotting railroad ties.

A permit-by-rule was obtained. The existing structure was taken apart. The cobbles were stockpiled for future use. Filter fabric installed along the impacted shoreline. Constructed the new structure from pressure treated lumber and returned the cobbles to the interior of the cribwall.